脚手架工程安全专项施工方案编制的主要内容

来源:伴沃教育


×××工程

外墙脚手架专项施工方案

编制单位:××××××××××× 编制日期:××××年××月××日

危险性较大的分部分项工程安全专项方案审批表

工程名称:×××××× 编号: 方案名称 外墙脚手架专项施工方案 技术部门审核意见: 部门负责人: 日 期: 安全管理部门审核意见: 部门负责人: 日 期: 质量管理部门审核意见: 部门负责人: 日 期: 公司技术负责人审批意见: 公司技术负责人: 日 期: ×××××××××××公司(章) 注:依照《危险性较大的分部分项工程安全管理办法》(建质[2009]87)号制定本表。 编制人

目 录

第一章 编制依据············································································································ 1

1. 法律、法规 ······································································································· 1 2. 主要规范、规程 ······························································································· 1 3. 施工合同 ··········································································································· 1 4. 施工图纸 ··········································································································· 1 5. 施工组织设计 ··································································································· 1 6. 参考资料 ··········································································································· 1 7. 其他 ··················································································································· 1 第二章 工程概况············································································································ 1

1. 工程建设概况 ··································································································· 1 2. 工程设计概况 ··································································································· 1 3. 现场环境 ··········································································································· 1 4. 工程特点 ··········································································································· 1 5. 施工平面布置 ··································································································· 1 6. 施工要求和技术保证条件 ··············································································· 1 第三章 施工安排············································································································ 1

1. 组织机构及岗位职责 ······················································································· 1 2. 工程施工目标 ··································································································· 1 3. 工程施工流水段及施工顺序 ··········································································· 1 3. 工程的重点、难点及对应措施 ······································································· 2 第四章 施工计划············································································································ 2

1. 施工进度计划 ··································································································· 2 2. 材料计划 ··········································································································· 2 3. 设备计划 ··········································································································· 2 4. 劳动力计划 ······································································································· 2 第五章 施工工艺技术 ··································································································· 2

1. 技术参数 ··········································································································· 2 2. 工艺流程 ··········································································································· 3

1

3. 施工方法 ··········································································································· 3 4. 检查验收 ··········································································································· 3 5. 质量控制措施 ··································································································· 3 6. 质量记录 ··········································································································· 3 7. 脚手架使用注意事项 ······················································································· 3 第六章 施工安全保证措施 ··························································································· 3

1. 组织保证措施 ··································································································· 3 2. 技术保证措施 ··································································································· 3 3. 监测监控 ··········································································································· 3 4. 应急预案 ··········································································································· 4 第七章 文明施工要求 ··································································································· 4 第八章 计算书及相关图纸 ··························································································· 4

1. 计算书 ··············································································································· 4 2. 相关图纸 ··········································································································· 4

2

第一章 编制依据

1. 法律、法规 2. 主要规范、规程 3. 施工合同 4. 施工图纸 5. 施工组织设计 6. 参考资料 7. 其他

第二章 工程概况

1. 工程建设概况

2. 工程设计概况(与脚手架工程相关的工程设计概况) 3. 现场环境 4. 工程特点 5. 施工平面布置

6. 施工要求和技术保证条件 6.1 施工要求 6.2 技术保证条件

第三章 施工安排

1. 组织机构及岗位职责 2. 工程施工目标 2.1 工期目标 2.2 质量目标 2.3 安全目标 2.4 环境目标 2.5 成本目标

3. 工程施工流水段及施工顺序 3.1 施工流水段 3.2 施工顺序

1

3.3 穿插作业的组织

3. 工程的重点、难点及对应措施

第四章 施工计划

1. 施工进度计划 2. 材料计划 3. 设备计划 4. 劳动力计划

第五章 施工工艺技术

1. 技术参数 1.1 设计总体思路 1.2 方案选择 1.3 基础技术参数 1.4 型钢悬挑梁的技术参数 1.5 立杆的技术参数 1.6 纵向水平杆的技术参数 1.7 横向水平杆的技术参数 1.8 连墙件的技术参数

1.9 剪刀撑与横向斜撑的技术参数 1.10 扫地杆的技术参数 1.11 脚手板的技术参数 1.12 脚手架开洞的技术参数 1.13 安全网的技术参数 1.14 安全防护的技术参数 (1)通道口防护 (2)电梯井洞口防护 (3)结构临边防护 (4)楼梯间防护 (5)防雷

1.15 施工电梯、物料提升机与脚手架的关系

2

2. 工艺流程

2.1 钢管脚手架搭设工艺流程 2.2 钢管脚手架拆除工艺流程 3. 施工方法 3.1 脚手架搭设 3.2 脚手架拆除 4. 检查验收 4.1 验收要求 4.2 验收时间

4.3 外脚手架的检查验收 4.4 脚手架的材质要求 4.5 构配件允许偏差

4.6 脚手架搭设的允许偏差和检验方法 4.7 扣件拧紧抽样检查数目及质量判定标准 5. 质量控制措施 6. 质量记录

7. 脚手架使用注意事项

第六章 施工安全保证措施

1. 组织保证措施 2. 技术保证措施

2.1 材质及其使用的安全技术措施 2.2 脚手架搭设的安全技术措施 2.3 脚手架上施工作业的安全技术措施 2.4 脚手架拆除的安全技术措施 3. 监测监控 3.1 日常检查、巡查 3.2 灾后检查 3.3 监测 3.3.1 监测项目

3

3.3.2 仪器设备配置 3.3.3 监测频率 3.3.4 监测的方法与工具 3.3.5 监测点布设 3.3.6 监测报警值 4. 应急预案

4.1 应急处理组织机构及职责 4.1.1 应急处理组织机构

姓名 岗位 组长 副组长 通讯联络 技术支持 保卫 抢险抢修 医疗救护 后勤保障 联系电话 4.1.2 应急组织的职责 4.2 应急资源准备 4.3 抢险教育、训练 4.4 应急救援通讯 4.5 应急救援预案 4.5.1 应急响应 4.5.2 应急救援装备 4.5.3 应急救援演练 4.5.4 应急救援措施

第七章 文明施工要求 第八章 计算书及相关图纸

1. 计算书 2. 相关图纸

4

2.1 相关建筑图 2.2 脚手架施工图 2.2.1 脚手架施工平面图 2.2.2 脚手架立面图 2.2.3 脚手架剖面图 2.2.4 脚手架节点大样图 2.2.5 监测点布设平面图

5