承包单位:编号分段AB合计AB合计AB合计AB合计AB合计AB合计AB合计10.00000.00150.250.0150000.98511215.00000.00150.250.0225000.97775120.00000.00150.250.0300000.97044625.00000.00150.250.0375000.96319417.51000.00150.250.0262650.97407720.08000.00150.250.0301200.970329Li(m)37.452θi(rad)0K0.0015μ0.25KLi+μθ0.056178ie-(Kli+μθi)1(7索)1(7索)1(7索)2(7索)2(7索)2(9索)2`(7索)0.945371说明:1、根据设计图将半个预应力束分段计算,预应力筋束采用φj15.24-7,张拉控制应力σPcon=σconAy=1395×980=1367100N=1367.1KN,μ=0.25,к=0.0015
2、此计算的仅为T梁一端的理论伸长值(一端考虑千斤顶及锚具的长度45cm)计算:
复核:
b
con=0.75Ry=1395Mpa,Ay=140
值计算表
部位:连续箱梁起点张拉力终点张拉力计算值PQi计算值PZi(N)(N)13671001292416△Li=1000PQiLi1-e-(Kli+μθi)AyEg (Kli+μθi)(mm)260.5260.513671001326537141.5141.513671001331661123.6123.613671001316783175.5175.513671001326696141.0141.013671001336684106.1106.11367100134674771.071.0b7=980mm2,Ey=1.95×105Mpa,con=0.75Ry=1395Mpa,Ay=140×
制应力σ
监理: